Toll Free 1-877-257-9777

Quebec Oil & Gas-Recert Program

Oil & Gas Recert Program Overview

The 15-hour, Stormwater Management for Oil and Gas Construction Activities online recert program is comprised of seven (7) courses and corresponding exams.

This credentialing program is a problem-centered curriculum which covers conditions commonly encountered during oil and gas construction activities pertinent for stormwater management. 

The program is designed for individuals involved in stormwater management for oil and gas construction activities including inspectors, plan designers, regulators and BMP installers.

The program's central focus educates and trains on how to select, install and maintain Best Management Practices (BMPs) for common conditions encountered during oil and gas exploration and construction activities.

Prerequisites: Stormwater Management for Oil and Gas Construction Activities (Code: CS2OG)

Intended Audience

The Stormwater Management for Oil and Gas Construction Activities online recert program is specifically designed for professionals engaged in oil and gas construction activities within Quebec.

  • Owner/Oporators
  • Project Managers
  • Regulatory and Non-regulatory Inspectors
  • SWPPP Preparers/Reviewers/Administrators
  • Civil Consultants/Students
  • Environmental Consultants/Students
  • BMP Installers

Curriculum

Learning Objectives

The CS2OGR program will provide Quebec students with a fundamental knowledge of concentrated aspects of stormwater management so individuals can:

  • Identify the basic requirements of the regulatory program for stormwater management during oil and gas construction activities.
  • Describe the specific Best Management Practices (BMPs) implemented  to control sources of pollution during the following activities:

                                    -        Road construction

                                    -        Stream crossings

                                    -        Well Pad construction

                                    -        Pipeline construction

                                    -        Drilling operations

  • Describe the installation and maintenance requirements for Best Management Practices (BMPs) used during oil and gas construction activities. 
  • Explain the inspection and evaluation process for implemented erosion and sediment control Best Management Practices (BMPs) for proper use, installation and maintenance.

At the Completion of This Program You Will Receive



Each year 1.2 trillion gallons of untreated sewage, stormwater, and industrial waste are dumped into U.S. water.


Rating: 5.0 / 5.0

Committed Clients: