Toll Free 1-877-257-9777

Your State Public Education, Outreach and Involvement Course

Course Description

The first and second of six (6) Minimum Control Measures (MCM) in the MS4 Phase II of the NPDES permit are highlighted as follows:

  1. Public Education and Outreach
  2. Public Participation and Involvement
  3. Illicit Discharge Detection and Elimination (IDDE)
  4. Construction Site Runoff Control
  5. Post-Construction Runoff Control
  6. Pollution Prevention and Good Housekeeping

« Back to MS4 Bundle - Recert Program

Downloadable Resouces

Great course, the downloadable materials are very helpful and well designed.


Rating: 5.0 / 5.0

Chanler F., BETA Group Inc.
Committed Clients: