Toll Free 1-877-257-9777

Your State Construction Site Runoff Control Course

Course Description

The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:

  1.      Public Education and Outreach
  2.      Public Participation and Involvement
  3.      Illicit Discharge Detection and Elimination (IDDE)
  4.      Construction Site Runoff Control
  5.      Post-Construction Runoff Control
  6.      Pollution Prevention and Good Housekeeping

It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure. 

« Back to MS4 Bundle - Recert Program

Highly Recommend for the Advanced or a Beginner

..the instructor was great. Easy to follow along. I had no experience in this field and was very nervous. Got to work at my own pace through the online courses which gave me confidence once I got to the virtual instruction. I recommend to everyone regardless if you are advanced or a beginner in the field.


Rating: 5.0 / 5.0

Kim H, Commercial Property Services
Committed Clients: