Your State Construction Site Runoff Control Course
Course Description
The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination (IDDE)
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention and Good Housekeeping
It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure.
Highly Recommend for the Advanced or a Beginner
..the instructor was great. Easy to follow along. I had no experience in this field and was very nervous. Got to work at my own pace through the online courses which gave me confidence once I got to the virtual instruction. I recommend to everyone regardless if you are advanced or a beginner in the field.
Kim H, Commercial Property Services
Committed Clients: