Toll Free 1-877-257-9777

Utah Public Education, Outreach and Involvement Course

Course Description

The first and second of six (6) Minimum Control Measures (MCM) in the MS4 Phase II of the NPDES permit are highlighted as follows:

  1. Public Education and Outreach
  2. Public Participation and Involvement
  3. Illicit Discharge Detection and Elimination (IDDE)
  4. Construction Site Runoff Control
  5. Post-Construction Runoff Control
  6. Pollution Prevention and Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Utah MS4 Bundle - Recert Program

From an average construction site, 30 tons of sediment per acre is eroded into nearby waterways.


Rating: 5.0 / 5.0

Committed Clients: