Toll Free 1-877-257-9777

Saskatchewan Post- Construction Course

Course Description

This course defines where Post-Construction Runoff Control is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.

The Post Construction Runoff Control is the fifth Minimum Control Measure as shown here:

  1.        Public Education
  2.        Public Involvement
  3.        Illicit Discharge Detection and Elimination
  4.        Construction
  5.        Post-Construction Runoff Control
  6.        Pollution Prevention/Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Saskatchewan MS4 Bundle - Recert Program

The live sessions from Brad were amazing

Stormwaterone course Qualified Compliance Inspector of Stormwater (QCIS) Advanced Curriculum has been a great experience. The live sessions from Brad were amazing, taking us learners through a wealth of knowledge on the subject of stormwater compliance.


Rating: 5.0 / 5.0

Jose' A., Worley
Committed Clients: