Nevada Public Education, Outreach and Involvement Course
Course Description
The first and second of six (6) Minimum Control Measures (MCM) in the MS4 Phase II of the NPDES permit are highlighted as follows:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination (IDDE)
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention and Good Housekeeping
Course Demos
From an average construction site, 30 tons of sediment per acre is eroded into nearby waterways.
Committed Clients: