Toll Free 1-877-257-9777

Maryland Post- Construction Course

Course Description

This course defines where Post-Construction Runoff Control is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.

The Post Construction Runoff Control is the fifth Minimum Control Measure as shown here:

  1.        Public Education
  2.        Public Involvement
  3.        Illicit Discharge Detection and Elimination
  4.        Construction
  5.        Post-Construction Runoff Control
  6.        Pollution Prevention/Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Maryland MS4 Bundle - Recert Program

I have more confidence...

The course was very good at speaking of topics that can get quite technical in a way that most would find understandable. The topics within the course are very relevant to the project I am on and now I feel like I have more confidence with being the environmental compliant inspector. Who can ask for much more than that!?! No complaints.


Rating: 5.0 / 5.0

John K.
Committed Clients: