Washington Construction Site Runoff Control Course
Course Description
The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination (IDDE)
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention and Good Housekeeping
It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure.
Course Demos
Comprehensive and Easy to Retain
The class was very comprehensive and easy to retain. I was able to complete in one sitting and is exactly what I needed for required employment certification.
Matt L., City of Insanti
Committed Clients: