Tennessee Post- Construction Course
Course Description
This course defines where Post-Construction Runoff Control is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.
The Post Construction Runoff Control is the fifth Minimum Control Measure as shown here:
- Public Education
- Public Involvement
- Illicit Discharge Detection and Elimination
- Construction
- Post-Construction Runoff Control
- Pollution Prevention/Good Housekeeping
Course Demos
Highly Recommend for the Advanced or a Beginner
..the instructor was great. Easy to follow along. I had no experience in this field and was very nervous. Got to work at my own pace through the online courses which gave me confidence once I got to the virtual instruction. I recommend to everyone regardless if you are advanced or a beginner in the field.
Kim H, Commercial Property Services
Committed Clients: