South Carolina Construction Site Runoff Control Course
Course Description
The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination (IDDE)
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention and Good Housekeeping
It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure.
Course Demos
There is a total of 72,288 Causes of Water Impairment, 28,679 of these impairments are caused by construction and construction related activities.
Committed Clients: