Toll Free 1-877-257-9777

Saskatchewan Public Education, Outreach and Involvement Course

Course Description

The first and second of six (6) Minimum Control Measures (MCM) in the MS4 Phase II of the NPDES permit are highlighted as follows:

  1. Public Education and Outreach
  2. Public Participation and Involvement
  3. Illicit Discharge Detection and Elimination (IDDE)
  4. Construction Site Runoff Control
  5. Post-Construction Runoff Control
  6. Pollution Prevention and Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Saskatchewan MS4 Bundle Program

Downloadable Resouces

Great course, the downloadable materials are very helpful and well designed.


Rating: 5.0 / 5.0

Chanler F., BETA Group Inc.
Committed Clients: