Toll Free 1-877-257-9777

Saskatchewan Construction Site Runoff Control Course

Course Description

The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:

  1.      Public Education and Outreach
  2.      Public Participation and Involvement
  3.      Illicit Discharge Detection and Elimination (IDDE)
  4.      Construction Site Runoff Control
  5.      Post-Construction Runoff Control
  6.      Pollution Prevention and Good Housekeeping

It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure. 

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Saskatchewan MS4 Bundle Program

This was an excellent course

This was an excellent course. It was simple to understand. This course conveyed all the information in a strait forward manner that didn't make you question the appropriate answer when taking the test.


Rating: 5.0 / 5.0

Tristin W.
Committed Clients: