Toll Free 1-877-257-9777

New Hampshire Post- Construction Course

Course Description

This course defines where Post-Construction Runoff Control is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.

The Post Construction Runoff Control is the fifth Minimum Control Measure as shown here:

  1.        Public Education
  2.        Public Involvement
  3.        Illicit Discharge Detection and Elimination
  4.        Construction
  5.        Post-Construction Runoff Control
  6.        Pollution Prevention/Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to New Hampshire MS4 Bundle Program

Recommend for any person looking to renew their CESCL

I needed to renew my CESCL card that was due to expire in a few months and I knew I wouldn't have a chance then. I took a period of relative downtime and was able to renew my card from my work desk. Material was well presented and discussed the real world elements of CESCL inspection and not hours of permit review. I will recommend it for any person looking to renew their CESCL.


Rating: 5.0 / 5.0

Robert H.
Committed Clients: