Toll Free 1-877-257-9777

Montana Public Education, Outreach and Involvement Course

Course Description

The first and second of six (6) Minimum Control Measures (MCM) in the MS4 Phase II of the NPDES permit are highlighted as follows:

  1. Public Education and Outreach
  2. Public Participation and Involvement
  3. Illicit Discharge Detection and Elimination (IDDE)
  4. Construction Site Runoff Control
  5. Post-Construction Runoff Control
  6. Pollution Prevention and Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Montana MS4 Bundle Program

Diverting offsite runoff around a disturbed area reduces the amount of stormwater which comes into contact with the exposed soils. If there is less runoff coming in contact with exposed soil, then there will be less erosion of the soil and less stormwater which has to be treated to remove sediment.


Rating: 5.0 / 5.0

Committed Clients: