Toll Free 1-877-257-9777

Minnesota Post- Construction Course

Course Description

This course defines where Post-Construction Runoff Control is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.

The Post Construction Runoff Control is the fifth Minimum Control Measure as shown here:

  1.        Public Education
  2.        Public Involvement
  3.        Illicit Discharge Detection and Elimination
  4.        Construction
  5.        Post-Construction Runoff Control
  6.        Pollution Prevention/Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Minnesota MS4 Bundle Program

One-Stop Shop!

StormwaterONE is a wealth of information! If you're just starting out or a seasoned professional needing additional information, StormwaterONE is a quality one-stop shop. The staff is helpful, and the information is relevant. Keep up the good work!


Rating: 5.0 / 5.0

Chad J, Sealaska Constructors LLC
Committed Clients: