District of Columbia Construction Site Runoff Control Course
Course Description
The fourth Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit is highlighted below:
- Public Education and Outreach
- Public Participation and Involvement
- Illicit Discharge Detection and Elimination (IDDE)
- Construction Site Runoff Control
- Post-Construction Runoff Control
- Pollution Prevention and Good Housekeeping
It is highly encouraged to develop this Minimum Control Measure along with the Post-Construction Site Runoff Control Minimum Control Measure.
Course Demos
Seamless Registration
Course registration was seamless. The online course was easy to navigate and the course materials were easily accessible.
Amanda S, National Park Service
Committed Clients: