Toll Free 1-877-257-9777

Colorado IDDE Course

Course Description

Illicit Discharge Detection and Elimination (IDDE) is the third Minimum Control Measure (MCM) in the MS4 Phase II of the NPDES permit as follows:

 

  1.        Public Education
  2.        Public Involvement
  3.        Illicit Discharge Detection and Elimination (IDDE)
  4.        Construction
  5.        Post-Construction Runoff Control
  6.        Pollution Prevention/Good Housekeeping

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Colorado MS4 Bundle Program

Downloadable Resouces

Great course, the downloadable materials are very helpful and well designed.


Rating: 5.0 / 5.0

Chanler F., BETA Group Inc.
Committed Clients: