Toll Free 1-877-257-9777

Montana Oil & Gas Course

Course Description

This course will cover how to properly select, install and maintain erosion and sediment control and pollution prevention Best Management Practices (BMPs) for stormwater management when constructing well pad sites and pipelines during oil and gas exploration and development activities.

Course Demos


Outline

Objectives

Training

Interaction

Quiz

« Back to Montana Oil & Gas-Recert Program

Diverting offsite runoff around a disturbed area reduces the amount of stormwater which comes into contact with the exposed soils. If there is less runoff coming in contact with exposed soil, then there will be less erosion of the soil and less stormwater which has to be treated to remove sediment.


Rating: 5.0 / 5.0

Committed Clients: