Toll Free 1-877-257-9777

Arkansas QPSWPPP Program

QPswppp Program Overview

The 16.5-hour, Qualified Preparer of Stormwater Pollution Prevention Plan (QPSWPPP) credentialing porgram is comprised of six ADA compliant self-paced interactive online courses.

This program educates individuals to prepare Construction Stormwater Pollution Prevention Plan (SWPPP) in compliance with the National Pollutant Discharge Elimination System (NPDES) permitting program.

As a QPSWPPP, you will receive a dual credential as a QCIS, which qualifies you to inspect and maintain construction sites for stormwater compliance. This program covers a range of topics including erosion and sediment control, pollution prevention (good housekeeping), on-site construction inspections, and the regulations outlined by the National Pollutant Discharge Elimination System (NPDES) permitting program.

This program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.

Upgrade to our Virtual Instructor Led Training here!

Intended Audience

  • Regulatory Enforcement Inspectors
  • SWPPP Preparers/Reviewers/Administrators
  • Non-regulatory 3rd Party Inspectors
  • Civil Consultants/Students
  • Environmental Consultants/Students

Curriculum

Learning Objectives

  • Identify the components and framework of the National Pollutant Discharge Elimination System (NPDES) permit program.

  • Describe the proper installation and maintenance of stormwater Best Management Practices (BMPs).

  • Identify the steps necessary to inspect a construction sites and determine possible causes of BMP ineffectiveness and how to correct them.

  • Explain how to complete an inspection report and document corrective actions.

  • Summarize the communication process necessary between owner, operators, contractors, and stormwater pollution prevention plan designer so the site stays in compliance throughout the construction project.

At the Completion of This Program You Will Receive



From an average construction site, 30 tons of sediment per acre is eroded into nearby waterways.


Rating: 5.0 / 5.0

Committed Clients: