{"title":"North Carolina","description":"\u003cp data-gtm-vis-has-fired9712871_13=\"1\"\u003eThe State of North Carolina and the N.C. Division of Water Quality’s Stormwater Permitting Unit of the Wetlands and Stormwater Branch is responsible for the development, planning, and implementation of statewide stormwater control policies, strategies, and rules designed to protect the surface waters of North Carolina from impacts of stormwater pollutants and run-off volumes. This particular Division handles permitting for industrial, municipal, and post-construction (for development projects) stormwater programs, and also provides technical assistance to regulated community, engineers, industry, citizens, as well as local governments.  \u003c\/p\u003e\n\u003cp data-gtm-vis-has-fired9712871_13=\"1\"\u003eAs per the N.C. Division of Water Quality, all owners and operators of stormwater discharges associated with construction activities (clearing, grading or excavation activities) resulting in the disturbance of one (1) acre or greater of land, or is part of a common plan of development of that size, require a local- or state-approved Erosion and Sedimentation Control Plan (E\u0026amp;SC Plan) as well as coverage under Construction NPDES Stormwater General Permit. The project will be automatically covered by an NPDES Stormwater General Permit for construction-related activities, only if the ground stabilization and basin design requirements in that permit are included in the E\u0026amp;SC Plan.\u003c\/p\u003e","products":[{"product_id":"cp299a","title":"Qualified Preparer of Stormwater Pollution Prevention Plan - ADVANCED (QPSWPPP+)","description":"\u003cp lang=\"EN-US\"\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eThe \u003c\/span\u003e\u003cstrong\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eQualified Preparer of Stormwater Pollution Prevention Plans - Advanced (QPSWPPP+) \u003c\/span\u003e\u003c\/strong\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003ecredentialing utilizes a blended training format comprised of \u003cstrong\u003esix (6) ADA compliant self-paced interactive online courses and four (4) Virtual Instructor Led Training (VILT) sessions\u003c\/strong\u003e.\u003c\/span\u003e \u003c\/p\u003e\n\u003cp lang=\"EN-US\"\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eThis Advanced credentialing program educates individuals to prepare Construction Stormwater Pollution Prevention Plan (SWPPP) in compliance with the \u003c\/span\u003e\u003cspan data-contrast=\"none\" lang=\"EN-US\"\u003eNational\u003c\/span\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003e Pollutant Discharge Elimination System (NPDES) permit program.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv\u003e\n\u003cp lang=\"EN-US\"\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eAs a QPSWPPP+, you will receive a dual credential as a QCIS+, which qualifies you to inspect and maintain construction sites for stormwater compliance. This program covers the principles and practices of erosion and sediment control as well as the proper reporting and documentation requirements.\u003c\/span\u003e \u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cp lang=\"EN-US\"\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eThe additional VILT sessions are designed to enhance participants' comprehension by fostering collaboration among peers, engaging with the instructor for guidance, and completing inspection exercises to apply the concepts learned in the online courses.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp lang=\"EN-US\"\u003e\u003cspan data-contrast=\"auto\" lang=\"EN-US\"\u003eHere is what you get:\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli lang=\"EN-US\"\u003eWeekly real-time interaction with our Stormwater Training Instructor\u003c\/li\u003e\n\u003cli lang=\"EN-US\"\u003eAdvance your skills with live Q\u0026amp;A and real construction site experiences\u003c\/li\u003e\n\u003cli lang=\"EN-US\"\u003eCourses start every two weeks\u003c\/li\u003e\n\u003cli lang=\"EN-US\"\u003eEach Virtual Instructor Led Training (VILT) session is 1-hour\u003c\/li\u003e\n\u003cli lang=\"EN-US\"\u003ePrepare a mock Stormwater Inspection Report\u003c\/li\u003e\n\u003cli lang=\"EN-US\"\u003eStep-by-step SWPPP Preparation training\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/em\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44702741168326,"sku":"CP299A","price":1224.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CP299A.png?v=1779244058"},{"product_id":"im299","title":"Qualified Industrial Stormwater Manager (QISM)","description":"\u003cp\u003e\u003cspan data-contrast=\"none\" lang=\"EN-US\"\u003eThe\u003cstrong\u003e  \u003c\/strong\u003e\u003c\/span\u003e\u003cstrong\u003e\u003cspan data-contrast=\"none\" lang=\"EN-US\"\u003eQualified Industrial Stormwater Manager\u003c\/span\u003e (QISM)\u003c\/strong\u003e credentialing program consists of \u003cstrong\u003eeight (8) online chapters, culminating in an exam where you'll showcase your skills through a submitted action plan and site design assignment\u003c\/strong\u003e to earn your credential.\u003c\/p\u003e\n\u003cp\u003eThis program educates individuals to prepare and inspect Industrial Stormwater Pollution Prevention Plans (SWPPP) in compliance with the National Pollutant Discharge Elimination System (NPDES) permit program.  \u003c\/p\u003e\n\u003cp\u003eAs a QISM, you will also receive the education which qualifies you to inspect and maintain industrial sites for stormwater compliance as well as create the Industrial SWPPP.\u003cbr\u003e\u003cbr\u003eThis program covers the principles and practices of industrial stormwater management as well as the proper reporting and documentation requirements for ensuring compliance under the NPDES permit program. \u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44705288224966,"sku":"IM299","price":799.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/IM299.png?v=1758813390"},{"product_id":"cs2re","title":"Revised Universal Soil Loss Equation (RUSLE2)","description":"\u003cp\u003eThis RUSLE2 Modeling course delves into the principles of soil erosion, the mechanics behind the \u003cstrong\u003eRevised Universal Soil Loss Equation (RUSLE)\u003c\/strong\u003e models, and their practical applications in various environmental and construction settings. Participants will learn to use the official NRCS RUSLE2 software for accurate erosion prediction and effective soil conservation strategies. This RUSLE2 training course is designed for qualified SWPPP developers, environmental professionals, land developers, and anyone involved in land management, providing both theoretical knowledge and practical skills necessary to mitigate erosion impact and enhance land sustainability. \u003c\/p\u003e\n\u003cp\u003eA key component of the course is the \u003cstrong\u003ePractical Application Assignment\u003c\/strong\u003e, which bridges theoretical knowledge with real-world scenarios. This hands-on assignment challenges students to apply the RUSLE2 model to actual case studies, enabling them to analyze and predict soil erosion under various land-use conditions. By engaging with this practical exercise, participants will enhance their ability to design and implement effective soil conservation measures tailored to specific project needs, thereby solidifying their learning and ensuring they can apply their knowledge effectively in their professional environments.\u003c\/p\u003e\n\u003cp\u003eCommon uses for RUSLE2 Modeling in stormwater management include:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003ePredict Erosion Rates:\u003c\/strong\u003e Calculate soil loss for each project phase, ensuring erosion controls maintain conditions as protective as pre-construction levels.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEvaluate Sediment Risk:\u003c\/strong\u003e Determine sediment risk levels (low, medium, or high) based on soil loss rates, factoring in receiving water risk.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManage Sediment Delivery:\u003c\/strong\u003e Select and evaluate temporary Best Management Practices (BMPs) to minimize sediment transport to water bodies.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMeet Regulatory Requirements:\u003c\/strong\u003e Demonstrate compliance with Total Maximum Daily Load (TMDL) limits, including mass-based wasteload allocation for pollutants like nutrients, metals, and toxins.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNutrient Management:\u003c\/strong\u003e Address nutrient-rich sediments caused by disturbed soils such as nitrogen, phosphorus, and potassium.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eImplement Buffer Zone Alternatives:\u003c\/strong\u003e Use RUSLE2 Modeling to ensure erosion and sediment controls achieve equivalent sediment reduction to a 50-foot undisturbed natural buffer where maintaining such a buffer is infeasible.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFile Notice of Termination (NOT):\u003c\/strong\u003e Provide computational proof and photographic evidence to verify conditions align with pre-construction and post-construction computations.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44705295630534,"sku":"CS2RE","price":224.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CS2RE.png?v=1779210114"},{"product_id":"gi199r","title":"Introduction to Low Impact Development (LID) - Recert","description":"\u003cp\u003eThe StormwaterONE online \u003cstrong\u003eIntroduction to Low Impact Development (LID)\u003c\/strong\u003e course will provide information on stormwater management practices and principles as well as LID tools, methods, costs, BMPs and implementation guidelines.\u003c\/p\u003e\n\u003cp\u003eLID is an ecologically friendly approach to site development and stormwater management that emphasizes the integration of site design and planning techniques to conserve and protect the natural systems and hydrologic functions of a site.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44705421066438,"sku":"GI199R","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/GI199R.png?v=1779210467"},{"product_id":"mo199","title":"Public Education, Outreach and Involvement for MS4s","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePublic Education, Outreach and Involvement for MS4s\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the first two of the \u003cspan lang=\"EN\"\u003esix (6) \u003cstrong\u003eMinimum Control Measures (MCMs)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.  These control measures are required to meet the conditions of the \u003c\/span\u003e\u003cstrong\u003eNational Pollutant Discharge Elimination System (NPDES)\u003c\/strong\u003e \u003cspan lang=\"EN\"\u003epermit. \u003c\/span\u003e\u003cspan lang=\"EN\"\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eThis course will cover the requirements, BMPs and Measurable Goals to be developed and implemented for the first Minimum Control Measure which is \u003cstrong\u003ePublic Education and Outreach\u003c\/strong\u003e and the second Minimum Control Measure which is \u003cstrong\u003ePublic Participation and Involvement. \u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAn informed and knowledgeable community is crucial to the success of a Stormwater Management Program (SWMP) since it helps to ensure the following:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreater support\u003c\/strong\u003e for the program as the public gains a greater understanding of the reasons why it is necessary and important. Public support is particularly beneficial when operators of MS4s attempt to institute new funding initiatives for the program or seek volunteers to help implement the program; and\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreater compliance\u003c\/strong\u003e with the program as the public becomes aware of the personal responsibilities expected of them and others in the community.  This includes the individual actions they can take to protect or improve the quality of area waters.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.  This course also provides a history of the NPDES program as well as an introduction to the MS4 Program for Phase I and Phase II entities.\u003c\/p\u003e\n\u003cp\u003eGuidelines for developing and implementing these control measures are covered in addition to the reasons why public education and outreach as well as public participation and involvement are required.  Educational materials, strategies, forming partnerships, reaching diverse audiences and communities are discussed.  Implementation challenges are reviewed including alternative advertising methods and targeting population sectors.\u003c\/p\u003e\n\u003cp\u003eDetailed BMPs and specific and quantifiable Measurable Goal examples for each of these BMPs are provided that can be directly used in a Phase I and Phase II Stormwater Management Plan (SWMP).\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: .0001pt; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"\u003eThis course also provides MS4 recordkeeping and annual reporting guidelines as well as a sample Annual Report and additional resources.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44705434730694,"sku":"MO199","price":99.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MO199.png?v=1758813269"},{"product_id":"mr199r","title":"Construction Site Runoff Control for MS4s - Recert","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003eConstruction Site Runoff Control for MS4s\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the fourth \u003cstrong\u003eMinimum Control Measure (MCM)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.\u003cbr\u003e\u003cbr\u003eThis Construction Site Runoff Control Minimum Control Measure is required to meet the conditions of the \u003cstrong\u003eNational Pollutant Discharge Elimination System (NPDES)\u003c\/strong\u003e permit.  As authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. \u003cbr\u003e\u003cbr\u003eThe EPA Phase II Final Rule requires an operator of a regulated small MS4 to develop, implement, and enforce a program to reduce pollutants in stormwater runoff to their MS4 from construction activities that result in a land disturbance of \u003cstrong\u003eGREATER than or EQUAL to ONE (1) acre\u003c\/strong\u003e.\u003cbr\u003e\u003cbr\u003eThe MS4 operator is required to have an ordinance or other regulatory mechanism requiring the implementation of proper erosion and sediment controls, and controls for other wastes, on applicable construction sites.  Other requirements include having procedures for site plan review of construction plans that consider potential water quality impacts and procedures for site inspection and enforcement of control measures.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728162779334,"sku":"MR199R","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MR199R.png?v=1779210662"},{"product_id":"cssc1r","title":"General Construction Stormwater Awareness Training Course - Recert","description":"\u003cp\u003eThis 1.5 hour online course will educate non-land disturbing subcontractors and support staff on the basic principles and practices of erosion and sediment control, and promote the importance of complying with stormwater regulations for construction activities.\u003c\/p\u003e\n\u003cp\u003eThis course has been reviewed and recognized by the EPA and is a Level 100 United States Green Build Council approved course.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728164417734,"sku":"CSSC1R","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CSSC1R.png?v=1779211572"},{"product_id":"mo199r","title":"Public Education, Outreach and Involvement for MS4s - Recert","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePublic Education, Outreach and Involvement for MS4s\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the first two of the \u003cspan lang=\"EN\"\u003esix (6) \u003cstrong\u003eMinimum Control Measures (MCMs)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.  These control measures are required to meet the conditions of the \u003c\/span\u003e\u003cstrong\u003eNational Pollutant Discharge Elimination System (NPDES)\u003c\/strong\u003e \u003cspan lang=\"EN\"\u003epermit. \u003c\/span\u003e\u003cspan lang=\"EN\"\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eThis course will cover the requirements, BMPs and Measurable Goals to be developed and implemented for the first Minimum Control Measure which is \u003cstrong\u003ePublic Education and Outreach\u003c\/strong\u003e and the second Minimum Control Measure which is \u003cstrong\u003ePublic Participation and Involvement.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAn informed and knowledgeable community is crucial to the success of a Stormwater Management Program (SWMP) since it helps to ensure the following:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreater support\u003c\/strong\u003e for the program as the public gains a greater understanding of the reasons why it is necessary and important. Public support is particularly beneficial when operators of MS4s attempt to institute new funding initiatives for the program or seek volunteers to help implement the program; and\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreater compliance\u003c\/strong\u003e with the program as the public becomes aware of the personal responsibilities expected of them and others in the community.  This includes the individual actions they can take to protect or improve the quality of area waters.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.  This course also provides a history of the NPDES program as well as an introduction to the MS4 Program for Phase I and Phase II entities.\u003c\/p\u003e\n\u003cp\u003eGuidelines for developing and implementing these control measures are covered in addition to the reasons why public education and outreach as well as public participation and involvement are required.  Educational materials, strategies, forming partnerships, reaching diverse audiences and communities are discussed.  Implementation challenges are reviewed including alternative advertising methods and targeting population sectors.\u003c\/p\u003e\n\u003cp\u003eDetailed BMPs and specific and quantifiable Measurable Goal examples for each of these BMPs are provided that can be directly used in a Phase I and Phase II Stormwater Management Plan (SWMP).\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: .0001pt; line-height: normal; mso-layout-grid-align: none; text-autospace: none;\"\u003eThis course also provides MS4 recordkeeping and annual reporting guidelines as well as a sample Annual Report and additional resources.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728167727302,"sku":"MO199R","price":99.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MO199R.png?v=1758813291"},{"product_id":"mi199r","title":"Illicit Discharge Detection and Elimination (IDDE) - Recert","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003eIllicit Discharge Detection and Elimination (IDDE)\u003c\/strong\u003e covers key components necessary for a Municipal Separate Storm Sewer System (MS4) to develop and maintain an IDDE Program.  This course covers the available tools that are associated with the National Pollutant Discharge Elimination System (NPDES) of the Clean Water Act (CWA) to establish or re-establish your MS4 IDDE Program. \u003c\/p\u003e\n\u003cp\u003eThis course provides insight into finding the sources of discharges and highlights problems in identifying illicit discharge sources.  This course also provides information on illicit discharge detection, clues and possible findings, conducting inspections and sampling as well as non-stormwater outfall discharges with examples. \u003c\/p\u003e\n\u003cp\u003eIn addition outfall monitoring, program mapping considerations, common approaches to outfall screening including typical physical and chemical indicators are covered.  Information on inspection documentation, investigation, reporting and environmental crimes are covered.  Lastly, it provides tips on developing an effective IDDE Program.\u003c\/p\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.  This course defines where IDDE is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728168513734,"sku":"MI199R","price":124.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MI199R.png?v=1779211815"},{"product_id":"mp199r","title":"Post-Construction Stormwater Maintenance - Recert","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePost-Construction Stormwater Maintenance\u003c\/strong\u003e covers Post-Construction stormwater maintenance on various types of Best Management Practices (BMPs) including:\u003cstrong\u003e  \u003c\/strong\u003eStructural, Manufactured, Low Impact Development (LID), and Above and Below Ground Detention and Retention systems.  Examples of these types of BMPs include:  Bioretention facilities, Rain gardens, Vegetated “Green” roofs, Catch basins, Inlets\/outlets, and Oil water separators.\u003c\/p\u003e\n\u003cp\u003ePost-construction stormwater management in areas undergoing new development or redevelopment is necessary because runoff from these areas has been shown to significantly affect receiving water bodies.\u003c\/p\u003e\n\u003cp\u003eThis course covers Post-Construction maintenance tasks, issues, causes and correction of deficiencies as well as repair strategies for BMPs.  The BMP maintenance tasks are for MS4s, developers, and property owners to address stormwater runoff after construction activities have completed.\u003c\/p\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the National Pollutant Discharge Elimination System (NPDES) permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728168644806,"sku":"MP199R","price":124.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MP199R.png?v=1779211874"},{"product_id":"mg199r","title":"Pollution Prevention and Good Housekeeping for Municipal Operators - Recert","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePollution Prevention and Good Housekeeping for Municipal Operators\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the sixth \u003cstrong\u003eMinimum Control Measure (MCM)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eThis control measure is required to meet the conditions of the National Pollutant Discharge Elimination System (NPDES) permit.  As authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.\u003c\/p\u003e\n\u003cp\u003eThe Pollution Prevention\/Good Housekeeping Minimum Control Measure requires the MS4 operator to examine and then alter their own actions to help ensure a reduction in the amount and type of pollution that:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eCollects on streets, parking lots, open spaces, and storage and vehicle maintenance areas and is discharged into local waterways; and\u003c\/li\u003e\n\u003cli\u003eResults from actions such as environmentally damaging land development and flood management practices or poor maintenance of storm sewer systems.  Minimizing the potential pathways for contaminants carried in runoff is a key way to control pollutant discharges from MS4s.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThis course will cover types and sources of pollution, MS4 implementation procedures including requirements of an operator, guidelines for development, and key components of the SWMP.  The MS4 inventory process is outlined in detail along with planning process key components, steps to generate and maintain the inventories, and determining fixed facilities and field programs.  Identifying potential pollutant generating activities are also discussed. The MS4 assessment process is included for fixed facilities and field programs to identify and select BMPs as well as defining BMP objectives.\u003c\/p\u003e\n\u003cp\u003eNew construction, the Construction General Permit (CGP), the Stormwater Pollution Prevention Plan (SWPPP) are discussed focusing on requirements and mandates that must be upheld to stay in compliance on a construction site.\u003c\/p\u003e\n\u003cp\u003eThe following BMPs are detailed including: Construction waste, material storage, secondary containment, dust control, track out, street sweeping, and general pollution prevention standards.  Pavement cleaning, litter control, and equipment and vehicle cleaning guidelines are included. Spill reporting and spill kits on construction sites are also covered.\u003c\/p\u003e\n\u003cp\u003eMS4 recordkeeping, construction site recordkeeping, the Notice of Intent, signed certifications, and the MS4 Annual Report are explained in this course.  Additional resources are provided from the EPA and other stormwater agencies.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728168677574,"sku":"MG199R","price":149.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MG199R.png?v=1779211934"},{"product_id":"cp212","title":"Qualified Preparer of Stormwater Pollution Prevention Plans (QPSWPPP) - North Carolina","description":"\u003cp id=\"isPasted\"\u003eThe 18.5-hour,\u003cspan\u003e \u003c\/span\u003e\u003cstrong\u003eQualified Preparer of Stormwater Pollution Prevention Plans\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003e\u003cstrong\u003e(QPSWPPP)\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003ecredentialing program is comprised of six (6) ADA compliant self-paced interactive online courses and corresponding exams.\u003c\/p\u003e\n\u003cp\u003eThis program educates individuals to prepare Construction Stormwater Pollution Prevention Plans (SWPPPs) in compliance with the North Carolina NPDES Construction Stormwater General Permit program.\u003c\/p\u003e\n\u003cp\u003eAs a QPSWPPP, you will receive a dual credential as a QCIS, which qualifies you to inspect and maintain construction sites for stormwater compliance. This program covers a range of topics including erosion and sediment control, pollution prevention (good housekeeping), on-site construction inspections, and the regulations outlined by the North Carolina NPDES Construction Stormwater General Permit program.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/strong\u003e\u003c\/em\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728181129414,"sku":"CP212","price":924.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CP212.png?v=1760406022"},{"product_id":"ci212","title":"Qualified Compliance Inspector of Stormwater (QCIS) - North Carolina","description":"\u003cp\u003e\u003cspan\u003eThe 16-hour, \u003cstrong\u003eQualified Compliance Inspector of Stormwater (QCIS)\u003c\/strong\u003e credentialing program comprises of five (5) self-paced interactive online courses and corresponding exams, all designed for ADA compliance.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003c\/span\u003e\u003cspan\u003eThese courses cover a range of topics including erosion and sediment control, pollution prevention (good housekeeping measures), on-site construction inspections, and the regulations outlined by the North Carolina NPDES Construction Stormwater General Permit program. \u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eUpon successful completion, participants will be well-equipped to perform construction stormwater inspections in compliance with North Carolina standards. \u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cem\u003e\u003cspan\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/span\u003e\u003c\/em\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728181260486,"sku":"CI212","price":799.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI212.png?v=1760406021"},{"product_id":"ci212r","title":"Qualified Compliance Inspector of Stormwater (QCIS) Recert - North Carolina","description":"\u003cp id=\"isPasted\"\u003e\u003cspan\u003eThe 9-hour, \u003cstrong\u003eQualified Compliance Inspector of Stormwater (QCIS)\u003c\/strong\u003e online recert program is comprised of five (5) self-paced interactive online courses and corresponding exams, all designed for ADA compliance.\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThese courses cover a range of topics including erosion and sediment control, pollution prevention (good housekeeping), on-site construction inspections, and the regulations outlined by the North Carolina NPDES Construction Stormwater General Permit program.\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eThis program is designed to re-educate individuals who possess a QCIS or QPSWPPP credential to properly inspect and maintain a construction site in compliance with the \u003cspan id=\"isPasted\"\u003eNorth Carolina NPDES Construction Stormwater General Permit\u003c\/span\u003e program.\u003c\/strong\u003e\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eUpon successful completion, participants will be well-equipped to perform construction stormwater inspections in compliance with North Carolina standards.\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cem\u003e\u003cspan\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/span\u003e\u003c\/em\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728181358790,"sku":"CI212R","price":399.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI212R.png?v=1760406023"},{"product_id":"cp212r","title":"Qualified Preparer of Stormwater Polution Prevention Plans (QPSWPPP) Recert - North Carolina","description":"\u003cp id=\"isPasted\"\u003e\u003cspan\u003eThe 11-hour, \u003cstrong\u003eQualified Preparer of Stormwater Pollution Prevention Plans (QPSWPPP)\u003c\/strong\u003e online recert program is comprised of six (6) ADA compliant self-paced interactive online courses and corresponding exams.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eThis program is designed to\u003c\/strong\u003e \u003cspan id=\"isPasted\"\u003e\u003cstrong\u003ere-educate \u003c\/strong\u003e\u003c\/span\u003e\u003cstrong\u003eindividuals who possess a QCIS or QPSWPPP credential to prepare compliant Construction Stormwater Pollution Prevention Plans (SWPPPs).\u003c\/strong\u003e\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAs a QPSWPPP, you will receive a dual credential as a QCIS, which qualifies you to inspect and maintain construction sites for stormwater compliance. This program covers a range of topics including erosion and sediment control, pollution prevention (good housekeeping), on-site construction inspections, and the regulations outlined by the North Carolina NPDES Construction Stormwater General Permit program.\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003e\u003cspan\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/span\u003e\u003c\/strong\u003e\u003c\/em\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728181457094,"sku":"CP212R","price":549.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CP212R.png?v=1760406025"},{"product_id":"cs2og","title":"Stormwater Management for Oil and Gas Construction Activities","description":"\u003cp\u003eThe 15-hour, Stormwater Management for Oil and Gas Construction Activities online certificate program is comprised of seven (7) courses and corresponding exams.\u003c\/p\u003e\n\u003cp\u003eThis credentialing program is a problem-centered curriculum which covers conditions commonly encountered during oil and gas construction activities pertinent for stormwater management. \u003c\/p\u003e\n\u003cp\u003eThe program is designed for individuals involved in stormwater management for oil and gas construction activities including inspectors, plan designers, regulators and BMP installers.\u003c\/p\u003e\n\u003cp\u003eThe program's central focus educates and trains on how to select, install and maintain Best Management Practices (BMPs) for common conditions encountered during oil and gas exploration and construction activities.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728197218502,"sku":"CS2OG","price":799.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CS2OG.png?v=1779232927"},{"product_id":"mi199","title":"Illicit Discharge Detection and Elimination (IDDE)","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003eIllicit Discharge Detection and Elimination (IDDE)\u003c\/strong\u003e covers key components necessary for a Municipal Separate Storm Sewer System (MS4) to develop and maintain an IDDE Program.  This course covers the available tools that are associated with the National Pollutant Discharge Elimination System (NPDES) of the Clean Water Act (CWA) to establish or re-establish your MS4 IDDE Program. \u003c\/p\u003e\n\u003cp\u003eThis course provides insight into finding the sources of discharges and highlights problems in identifying illicit discharge sources.  This course also provides information on illicit discharge detection, clues and possible findings, conducting inspections and sampling as well as non-stormwater outfall discharges with examples. \u003c\/p\u003e\n\u003cp\u003eIn addition outfall monitoring, program mapping considerations, common approaches to outfall screening including typical physical and chemical indicators are covered.  Information on inspection documentation, investigation, reporting and environmental crimes are covered.  Lastly, it provides tips on developing an effective IDDE Program.\u003c\/p\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.  This course defines where IDDE is one of the six (6) Minimum Control Measures (MCMs) that the operator of a Phase II regulated small MS4 is required to include in its stormwater management program to meet the conditions of the NPDES permit.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728197316806,"sku":"MI199","price":124.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MI199.png?v=1758811274"},{"product_id":"cs2ogr","title":"Stormwater Management for Oil and Gas Construction Activities - Recert","description":"\u003cp\u003eThe 15-hour, Stormwater Management for Oil and Gas Construction Activities online recert program is comprised of seven (7) courses and corresponding exams.\u003c\/p\u003e\n\u003cp\u003eThis credentialing program is a problem-centered curriculum which covers conditions commonly encountered during oil and gas construction activities pertinent for stormwater management. \u003c\/p\u003e\n\u003cp\u003eThe program is designed for individuals involved in stormwater management for oil and gas construction activities including inspectors, plan designers, regulators and BMP installers.\u003c\/p\u003e\n\u003cp\u003eThe program's central focus educates and trains on how to select, install and maintain Best Management Practices (BMPs) for common conditions encountered during oil and gas exploration and construction activities.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003ePrerequisites:\u003c\/strong\u003e Stormwater Management for Oil and Gas Construction Activities (Code: CS2OG)\u003c\/em\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728199381190,"sku":"CS2OGR","price":374.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CS2OGR.png?v=1779233237"},{"product_id":"csr00","title":"2022 - 2027 Federal Construction General Permit (CGP)","description":"\u003cp\u003eThis 4.5-hour computer based training course educates professionals about the Federal Construction General Permit.  The Federal Construction General Permit covers stormwater and non-stormwater related construction discharges to waters of the United States from construction sites with a land disturbance area of one acre or more.\u003c\/p\u003e\n\u003cp\u003eThe Federal Construction General Permit is applicable for construction sites within Massachusetts, New Hampshire, New Mexico, Indian Country lands, federal facilities, District of Columbia, Puerto Rico and all other U.S. territories.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728199676102,"sku":"CSR00","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CSR00.png?v=1779233602"},{"product_id":"cssc1","title":"General Construction Stormwater Awareness Training Course","description":"\u003cp\u003eThis 1.5 hour online course will educate non-land disturbing subcontractors and support staff on the basic principles and practices of erosion and sediment control, and promote the importance of complying with stormwater regulations for construction activities.\u003c\/p\u003e\n\u003cp\u003eThis course has been reviewed and recognized by the EPA and is a Level 100 United States Green Build Council approved course.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728200822982,"sku":"CSSC1","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CSSC1.png?v=1779233898"},{"product_id":"mp199","title":"Post-Construction Stormwater Maintenance","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePost-Construction Stormwater Maintenance\u003c\/strong\u003e covers Post-Construction stormwater maintenance on various types of Best Management Practices (BMPs) including:\u003cstrong\u003e  \u003c\/strong\u003eStructural, Manufactured, Low Impact Development (LID), and Above and Below Ground Detention and Retention systems.  Examples of these types of BMPs include:  Bioretention facilities, Rain gardens, Vegetated “Green” roofs, Catch basins, Inlets\/outlets, and Oil water separators.\u003c\/p\u003e\n\u003cp\u003ePost-construction stormwater management in areas undergoing new development or redevelopment is necessary because runoff from these areas has been shown to significantly affect receiving water bodies.\u003c\/p\u003e\n\u003cp\u003eThis course covers Post-Construction maintenance tasks, issues, causes and correction of deficiencies as well as repair strategies for BMPs.  The BMP maintenance tasks are for MS4s, developers, and property owners to address stormwater runoff after construction activities have completed.\u003c\/p\u003e\n\u003cp\u003eAs authorized by the Clean Water Act (CWA), the National Pollutant Discharge Elimination System (NPDES) permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.  The NPDES program has Phase I and Phase II rulings and control measures.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728213242054,"sku":"MP199","price":124.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MP199.png?v=1779239780"},{"product_id":"mg199","title":"Pollution Prevention and Good Housekeeping for Municipal Operators","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003ePollution Prevention and Good Housekeeping for Municipal Operators\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the sixth \u003cstrong\u003eMinimum Control Measure (MCM)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eThis control measure is required to meet the conditions of the National Pollutant Discharge Elimination System (NPDES) permit.  As authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.\u003c\/p\u003e\n\u003cp\u003eThe Pollution Prevention\/Good Housekeeping Minimum Control Measure requires the MS4 operator to examine and then alter their own actions to help ensure a reduction in the amount and type of pollution that:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eCollects on streets, parking lots, open spaces, and storage and vehicle maintenance areas and is discharged into local waterways; and\u003c\/li\u003e\n\u003cli\u003eResults from actions such as environmentally damaging land development and flood management practices or poor maintenance of storm sewer systems.  Minimizing the potential pathways for contaminants carried in runoff is a key way to control pollutant discharges from MS4s.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThis course will cover types and sources of pollution, MS4 implementation procedures including requirements of an operator, guidelines for development, and key components of the SWMP.  The MS4 inventory process is outlined in detail along with planning process key components, steps to generate and maintain the inventories, and determining fixed facilities and field programs.  Identifying potential pollutant generating activities are also discussed. The MS4 assessment process is included for fixed facilities and field programs to identify and select BMPs as well as defining BMP objectives.\u003c\/p\u003e\n\u003cp\u003eNew construction, the Construction General Permit (CGP), the Stormwater Pollution Prevention Plan (SWPPP) are discussed focusing on requirements and mandates that must be upheld to stay in compliance on a construction site.\u003c\/p\u003e\n\u003cp\u003eThe following BMPs are detailed including: Construction waste, material storage, secondary containment, dust control, track out, street sweeping, and general pollution prevention standards.  Pavement cleaning, litter control, and equipment and vehicle cleaning guidelines are included. Spill reporting and spill kits on construction sites are also covered.\u003c\/p\u003e\n\u003cp\u003eMS4 recordkeeping, construction site recordkeeping, the Notice of Intent, signed certifications, and the MS4 Annual Report are explained in this course.  Additional resources are provided from the EPA and other stormwater agencies.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728215634118,"sku":"MG199","price":149.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MG199.png?v=1779240086"},{"product_id":"mr199","title":"Construction Site Runoff Control for MS4s","description":"\u003cp\u003eStormwaterONE’s online course for \u003cstrong\u003eConstruction Site Runoff Control for MS4s\u003c\/strong\u003e is designed to cover some of the key components necessary for a \u003cstrong\u003eMunicipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e to adhere to the fourth \u003cstrong\u003eMinimum Control Measure (MCM)\u003c\/strong\u003e that an operator of an MS4 is required to include in its \u003cstrong\u003eStormwater Management Program (SWMP)\u003c\/strong\u003e.\u003cbr\u003e\u003cbr\u003eThis Construction Site Runoff Control Minimum Control Measure is required to meet the conditions of the \u003cstrong\u003eNational Pollutant Discharge Elimination System (NPDES)\u003c\/strong\u003e permit.  As authorized by the Clean Water Act (CWA), the NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. \u003cbr\u003e\u003cbr\u003eThe EPA Phase II Final Rule requires an operator of a regulated small MS4 to develop, implement, and enforce a program to reduce pollutants in stormwater runoff to their MS4 from construction activities that result in a land disturbance of \u003cstrong\u003eGREATER than or EQUAL to ONE (1) acre\u003c\/strong\u003e.\u003cbr\u003e\u003cbr\u003eThe MS4 operator is required to have an ordinance or other regulatory mechanism requiring the implementation of proper erosion and sediment controls, and controls for other wastes, on applicable construction sites.  Other requirements include having procedures for site plan review of construction plans that consider potential water quality impacts and procedures for site inspection and enforcement of control measures.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728215666886,"sku":"MR199","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MR199.png?v=1779240163"},{"product_id":"ci199","title":"Stormwater Management for Construction Activities (U.S.)","description":"\u003cp\u003eThis Level 1 program covers an overview of the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program, the proper installation and maintenance of temporary pollution controls (Best Management Practices - \"BMPs\") and On-Site Construction Inspections.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217010374,"sku":"CI199","price":349.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI199.png?v=1779241195"},{"product_id":"ci199a","title":"Stormwater Management for Construction Activities - ADVANCED","description":"\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003eConstruction sites don't run on compliance paperwork alone — they run on people who know what to do when it rains, when a BMP fails, and when an inspector shows up. This advanced program builds that operational knowledge.\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003eCI199A is designed for construction supervisors, foremen, contractors, and QSP Delegates who need more than the regulatory basics. It delivers a working understanding of the Clean Water Act and NPDES permit program, hands-on BMP installation and maintenance, and on-site inspection skills — through a blended format combining self-paced online coursework with live virtual instructor-led training.\u003c\/p\u003e\n\u003cp class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"\u003e\u003cstrong\u003eFor California teams:\u003c\/strong\u003e CI199A pairs directly with the QSP Delegate Training course as an advanced add-on. The Delegate Training (Modules 1.a–1.c) meets the baseline requirements of the 2022 Construction General Permit (CGP) under Section V.E.1. CI199A goes further — covering the stormwater management principles that make a delegate genuinely effective in the field, not just technically compliant on paper.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217075910,"sku":"CI199A","price":449.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI199A.png?v=1779241271"},{"product_id":"ci199r","title":"Stormwater Management for Construction Activities - Recert (U.S.)","description":"\u003cp\u003eThis Level 1 Recert program covers an overview of the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program, the proper installation and maintenance of temporary pollution controls (Best Management Practices - \"BMPs\"), and On-Site Construction Inspections.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217174214,"sku":"CI199R","price":349.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI199R.png?v=1779241345"},{"product_id":"gi199","title":"Introduction to Low Impact Development (LID)","description":"\u003cp\u003eStormwaterONE’s online \u003cstrong\u003eLow Impact Development (LID) for Stormwater Management\u003c\/strong\u003e course is designed to educate students on Low Impact Development (LID) practices and concepts. The goals, tools, costs, methods, as well as Best Management Practices (BMPs), implementation and maintenance of LID for stormwater management will be covered.\u003c\/p\u003e\n\u003cp\u003eThis course is designed to educate students on a variety of LID practices and systems that mimic or preserve natural drainage processes to result in the infiltration, evapotranspiration or use of stormwater in order to protect water quality and associated aquatic habitat.\u003c\/p\u003e\n\u003cp\u003eLID is an ecologically friendly approach to site development and stormwater management that aims to mitigate development impacts to land and water.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe goal of any construction project is to design a hydrologically functional site that mimics predevelopment conditions.\u003c\/strong\u003e This is achieved by using design techniques that infiltrate, filter, evaporate, and store runoff close to its source. Rather than rely on costly large-scale conveyance and treatment systems, LID addresses stormwater through a variety of small, cost-effective landscape features located on-site. \u003c\/p\u003e\n\u003cp\u003eLow Impact Development relates directly to construction because it is very easy to ruin the post-construction function of a LID BMP during the construction process.\u003c\/p\u003e\n\u003cp\u003eLow Impact Development focuses more on providing \u003cstrong\u003eGREENER \u003c\/strong\u003estormwater infrastructure as well as the following:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eMaintaining and restoring natural hydrology,\u003c\/li\u003e\n\u003cli\u003eProtecting natural resources,\u003c\/li\u003e\n\u003cli\u003eFulfilling environmental regulations,\u003c\/li\u003e\n\u003cli\u003eUsing science, plants and healthy soil, and\u003c\/li\u003e\n\u003cli\u003eMaintaining and restoring the natural hydrology.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe LID approach emphasizes the integration of site design and planning techniques that conserve the natural systems and hydrologic functions of a site. With urbanization and development, more impervious surface pavement and asphalt is added. This increases the volume of stormwater. When that is not managed properly, drainage systems are stressed.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217206982,"sku":"GI199","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/GI199.png?v=1779243631"},{"product_id":"ms299","title":"Six (6) Minimum Control Measures (MS4 Bundle)","description":"\u003cp\u003eThis is a bundle of StormwaterONE online courses regarding the \u003cstrong data-redactor-tag=\"strong\" data-verified=\"redactor\"\u003eSix Minimum Control Measures (MCMs)\u003c\/strong\u003e for \u003cstrong data-redactor-tag=\"strong\" data-verified=\"redactor\"\u003ePhase II Small Municipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e operators.\u003c\/p\u003e\n\u003cp\u003eOperators of regulated small MS4s are required to design their programs to: reduce the discharge of pollutants to the “maximum extent practicable” (MEP), protect water quality, and satisfy the appropriate water quality requirements of the \u003cstrong data-redactor-tag=\"strong\" data-verified=\"redactor\"\u003eClean Water Act\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eThe implementation of these six elements and associated \u003cstrong data-redactor-tag=\"strong\" data-verified=\"redactor\"\u003eBest Management Practices (BMPs)\u003c\/strong\u003e are expected to result in significant reduction of pollutants discharged into receiving waterbodies.\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cstrong\u003eCurriculum Includes:\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003e1) Public Education and Outreach\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDistributing educational materials and performing outreach to inform citizens about the impacts polluted stormwater runoff discharges can have on water quality.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e2) Public Participation\/Involvement\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eProviding opportunities for citizens to participate in program development and implementation, including effectively publicizing public hearings and\/or encouraging citizen representatives on a stormwater management panel.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e3) Illicit Discharge Detection and Elimination\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDeveloping and implementing a plan to detect and eliminate illicit discharges to the storm sewer system (includes developing a system map and informing the community about hazards associated with illegal discharges and improper disposal of waste).\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003e\u003cem\u003e4) Construction Site Runoff Control\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eDeveloping, implementing, and enforcing an erosion and sediment control program for construction activities that disturb 1 or more acres of land (controls could include silt fences and temporary stormwater detention ponds).\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003e\u003cem\u003e5) Post-Construction Runoff Control\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eDeveloping, implementing, and enforcing a program to address discharges of post-construction stormwater runoff from new development and redevelopment areas. Applicable controls could include preventative actions such as protecting sensitive areas (e.g., wetlands) or the use of structural BMPs such as grassed swales or porous pavement.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e6) Pollution Prevention\/Good Housekeeping\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDeveloping and implementing a program with the goal of preventing or reducing pollutant runoff from municipal operations. The program must include municipal staff training on pollution prevention measures and techniques (e.g., regular street sweeping, reduction in the use of pesticides or street salt, or frequent catch-basin cleaning).\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217272518,"sku":"MS299","price":624.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MS299.png?v=1758811635"},{"product_id":"im199","title":"Managing a Successful Stormwater Planned Maintenance Program","description":"\u003cdiv\u003e\n\u003cp\u003eThis course is designed to provide concepts and steps behind building a successful Stormwater Planned Maintenance Program (SPMP) for multiple sites across a wide range of regulatory compliance areas.\u003c\/p\u003e\n\u003cp\u003eThis course will begin by providing an overview of the five (5) steps to manage a successful SPMP, and then provide details, case studies, example scenarios, and photos of the tasks within each step.\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003eThe (5) Steps include:\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAwareness – Regulatory and Public Response\u003c\/li\u003e\n\u003cli\u003eIdentify – Types of Systems\u003c\/li\u003e\n\u003cli\u003eInventory – Stormwater Assets and Structures\u003c\/li\u003e\n\u003cli\u003eAssess – Condition of Systems\u003c\/li\u003e\n\u003cli\u003eImplement – Planned Maintenance Program\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217403590,"sku":"IM199","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/IM199.png?v=1758811492"},{"product_id":"csr99","title":"Intro to the National Pollutant Discharge Elimination System (NPDES) Permitting Program","description":"\u003cp\u003eThe Introduction to the National Pollutant Discharge Elimination System (NPDES) Permitting Program course will educate individuals of the permitting process and compliance standards of Clean Water Act's National Pollutant Discharge Elimination System.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217632966,"sku":"CSR99","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CSR99.png?v=1779241712"},{"product_id":"ci299a","title":"Qualified Compliance Inspector of Stormwater - ADVANCED (QCIS+)","description":"\u003cp\u003eThe \u003cstrong\u003eQualified Compliance Inspector of Stormwater – Advanced (QCIS+)\u003c\/strong\u003e credentialing program employs a blended training approach, combining five ADA compliant self-paced interactive online courses with three Virtual Instructor Led Training (VILT) sessions. This Advanced program equips individuals with the necessary qualifications to conduct thorough stormwater inspections in accordance with the National Pollutant Discharge Elimination System (NPDES) permitting program.\u003c\/p\u003e\n\u003cp\u003eThese courses cover a range of topics including erosion and sediment control, pollution prevention (good housekeeping), on-site construction inspections, and the regulations outlined by the NPDES permitting program. Upon successful completion of these courses, participants will be well-equipped to perform construction stormwater inspections in compliance with NPDES standards.\u003c\/p\u003e\n\u003cp\u003eThe additional VILT sessions are designed to enhance participants' comprehension by fostering collaboration among peers, engaging with the instructor for guidance, and completing inspection exercises to apply the concepts learned in the online courses.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eThis program has been reviewed and recognized by the EPA and is a Level 300 United States Green Build Council approved training.\u003c\/em\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217764038,"sku":"CI299A","price":999.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CI299A.png?v=1779244149"},{"product_id":"cca99","title":"Intro to Basic Stormwater Calculations","description":"\u003cp\u003eThis course provides basic hydrologic and hydraulic equations used in site design, beginning with a conceptual small suburban site and designing a bioretention basin to manage runoff.  \u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728217895110,"sku":"CCA99","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CCA99.png?v=1779242010"},{"product_id":"ms299r","title":"Six (6) Minimum Control Measures (MS4 Bundle) - Recert","description":"\u003cp\u003eThis is a bundle of StormwaterONE online courses regarding the \u003cstrong data-verified=\"redactor\" data-redactor-tag=\"strong\"\u003eSix Minimum Control Measures (MCMs)\u003c\/strong\u003e for \u003cstrong data-verified=\"redactor\" data-redactor-tag=\"strong\"\u003ePhase II Small Municipal Separate Storm Sewer System (MS4)\u003c\/strong\u003e operators.\u003c\/p\u003e\n\u003cp\u003eOperators of regulated small MS4s are required to design their programs to: reduce the discharge of pollutants to the “maximum extent practicable” (MEP), protect water quality, and satisfy the appropriate water quality requirements of the \u003cstrong data-verified=\"redactor\" data-redactor-tag=\"strong\"\u003eClean Water Act\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eThe implementation of these six elements and associated \u003cstrong data-verified=\"redactor\" data-redactor-tag=\"strong\"\u003eBest Management Practices (BMPs)\u003c\/strong\u003e are expected to result in significant reduction of pollutants discharged into receiving waterbodies.\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003e\u003cstrong\u003eCurriculum Includes:\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003e1) Public Education and Outreach\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDistributing educational materials and performing outreach to inform citizens about the impacts polluted stormwater runoff discharges can have on water quality.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e2) Public Participation\/Involvement\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eProviding opportunities for citizens to participate in program development and implementation, including effectively publicizing public hearings and\/or encouraging citizen representatives on a stormwater management panel.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e3) Illicit Discharge Detection and Elimination\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDeveloping and implementing a plan to detect and eliminate illicit discharges to the storm sewer system (includes developing a system map and informing the community about hazards associated with illegal discharges and improper disposal of waste).\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003e\u003cem\u003e4) Construction Site Runoff Control\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eDeveloping, implementing, and enforcing an erosion and sediment control program for construction activities that disturb 1 or more acres of land (controls could include silt fences and temporary stormwater detention ponds).\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003e\u003cem\u003e5) Post-Construction Runoff Control\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eDeveloping, implementing, and enforcing a program to address discharges of post-construction stormwater runoff from new development and redevelopment areas. Applicable controls could include preventative actions such as protecting sensitive areas (e.g., wetlands) or the use of structural BMPs such as grassed swales or porous pavement.\u003cbr\u003e\u003cbr\u003e\u003cem\u003e\u003cstrong\u003e6) Pollution Prevention\/Good Housekeeping\u003c\/strong\u003e\u003c\/em\u003e\u003cbr\u003eDeveloping and implementing a program with the goal of preventing or reducing pollutant runoff from municipal operations. The program must include municipal staff training on pollution prevention measures and techniques (e.g., regular street sweeping, reduction in the use of pesticides or street salt, or frequent catch-basin cleaning).\u003cbr\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728218190022,"sku":"MS299R","price":314.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/MS299R.png?v=1758812468"},{"product_id":"im199r","title":"Managing a Successful Stormwater Planned Maintenance Program (SPMP) - Recert","description":"\u003cp\u003eThis course is designed to provide concepts and steps behind building a successful Stormwater Planned Maintenance Program (SPMP) for multiple sites across a wide range of regulatory compliance areas.\u003c\/p\u003e\n\u003cp\u003eThis course will begin by providing an overview of the five (5) steps to manage a successful SPMP, and then provide details, case studies, example scenarios, and photos of the tasks within each step.\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003eThe (5) Steps include:\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAwareness – Regulatory and Public Response\u003c\/li\u003e\n\u003cli\u003eIdentify – Types of Systems\u003c\/li\u003e\n\u003cli\u003eInventory – Stormwater Assets and Structures\u003c\/li\u003e\n\u003cli\u003eAssess – Condition of Systems\u003c\/li\u003e\n\u003cli\u003eImplement – Planned Maintenance Program\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728218222790,"sku":"IM199R","price":74.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/IM199R.png?v=1758811537"},{"product_id":"bmp103","title":"Alternatives to Rip Rap (Environmentally-Sensitive Stream Stabilization Methods)","description":"\u003cp\u003eBy 2020, \u003cstrong\u003eJohn McCullah\u003c\/strong\u003e, as a practicing Geomorphologist and CPESC, has designed and built over 20 projects that demonstrate the methods discussed in this course, including re-directive methods such as Rock Vanes and Bendway Weirs, Longitudinal Stone Toe methods, Live Siltation, Willow Pole Planting of designed flood terraces, LWD, and much more.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow Well Do the Techniques Work?\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eAfter the “Alternatives to Rip Rap Research” was published in 2005, the Alberta Department of Transportation was keenly interested in testing and demonstrating the methods.\u003c\/p\u003e\n\u003cp\u003eA representative stretch of ROW along the Pembina River, near Hinton, Alberta, was selected as a site for the work.  A 4-day workshop was organized to test the effectiveness of Re-directive Rock Vanes, the use of Longitudinal Rock Toes and, importantly, how the methods could be implemented in a live stream with no increase in turbidity or downstream sedimentation.\u003c\/p\u003e\n\u003cp\u003eThe ADOT invited approximately 70 highway engineers, Alberta Department of Environment and the Department of Fisheries and Oceans to attend the 1-day classroom and 3-day field work.  Additionally, ADOT commissioned \u003cstrong\u003eDirt Time\u003c\/strong\u003e Video’s producer, James Swirsky, to make movies of the work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe Dirt Time (DT) videos used to assimilate the new methods demonstrated:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe first year’s project, completed in 2006, was such a success that another training was planned for the following season in 2007 and a similar project was tested for the Southern Province, at Willow Creek, about 150 miles south of Calgary.\u003c\/p\u003e\n\u003cp\u003eIn this course, over ten years of river restoration\/repair case studies are presented.  \u003cstrong\u003eJohn McCullah\u003c\/strong\u003e, \u003cstrong\u003edirttime.tv’s\u003c\/strong\u003e host, will guide you through these projects and what lessons were learned using video clips from the following locations:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003ePembina River, Hinton, AB, CA\u003c\/li\u003e\n\u003cli\u003eChena River, Fairbanks AK\u003c\/li\u003e\n\u003cli\u003eWillow Creek, So. Alberta, CA\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728219304134,"sku":"BMP103","price":399.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/Course-Thumbnail-Alt-to-Rip-Rap-v2.02.jpg?v=1781042319"},{"product_id":"bmp104","title":"25 Construction Site Best Management Practices (BMPs)","description":"\u003cp\u003eThis comprehensive online course is designed for construction professionals seeking to enhance their understanding of Best Management Practices (BMPs) for construction sites. Focused on preventing erosion, controlling sedimentation, and protecting water quality, this course covers 25 critical BMPs that are essential for maintaining environmental compliance and promoting sustainable construction practices.\u003c\/p\u003e\n\u003cp\u003eParticipants will explore the strategies and techniques used to manage runoff, minimize environmental impact, and ensure regulatory adherence at construction sites. Through engaging lessons and real-world examples, learners will gain practical knowledge on implementing BMPs effectively. This course is perfect for anyone involved in construction site planning, management, or environmental oversight.\u003c\/p\u003e\n\u003cp\u003eBy the end of this course, participants will be equipped to implement BMPs on construction sites and help reduce the environmental impact of their projects.\u003cbr\u003e\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":44728219467974,"sku":"BMP104","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/Dirt_Time_25_construction_site_bmps_400_x_300_px.png?v=1773844939"},{"product_id":"cs2f99","title":"Qualified Passive Stormwater Treatment Specialist (QPSTS) - NPDES","description":"\u003cp\u003eThe Qualified Passive Stormwater Treatment Specialist (QPSTS) credentialing program requires you to complete: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e5 - Self-paced interactive online training chapters,\u003c\/li\u003e\n\u003cli\u003e1 - Graded practical application assignment,\u003c\/li\u003e\n\u003cli\u003e1 - Practical application exercise, and\u003c\/li\u003e\n\u003cli\u003e1 - 25 question randomized multi-attempt exam to earn your credential.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThis training equips professionals with the \u003cstrong\u003eknowledge and practical skills\u003c\/strong\u003e to design, plan, and apply \u003cstrong\u003epolyacrylamides (PAMs)\u003c\/strong\u003e as passive treatment technologies for stormwater quality management.  \u003c\/p\u003e\n\u003cp\u003eParticipants will learn to develop compliant \u003cstrong\u003ePassive Treatment Plans (PTPs)\u003c\/strong\u003e, select approved products, and apply best practices for effective turbidity control while meeting toxicity and reporting standards.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":45470979915974,"sku":"CS2F99","price":499.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CS2F99.jpg?v=1779243760"},{"product_id":"2024-2029-north-carolina-construction-stormwater-general-permit","title":"2024 - 2029 North Carolina NPDES Construction Stormwater General Permit","description":"\u003cp data-start=\"0\" data-end=\"400\" id=\"isPasted\"\u003eStormwaterONE’s\u003cspan\u003e \u003c\/span\u003e\u003cstrong data-start=\"16\" data-end=\"86\"\u003eNorth Carolina NPDES Construction Stormwater General Permit Course\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003eprovides essential training for construction professionals responsible for managing stormwater compliance on active job sites. This course explains the requirements of the construction stormwater permit issued by the North Carolina Department of Environmental Quality under the National Pollutant Discharge Elimination System (NPDES).\u003c\/p\u003e\n\u003cp data-start=\"402\" data-end=\"902\" data-is-last-node=\"\" data-is-only-node=\"\"\u003eParticipants will learn how to properly develop and implement a Stormwater Pollution Prevention Plan (SWPPP), understand erosion and sediment control expectations, conduct compliant inspections, and manage corrective actions throughout the life of a construction project. Designed for contractors, inspectors, engineers, and SWPPP preparers, this course translates regulatory requirements into practical guidance that can be applied directly in the field across North Carolina.\u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":45609325887686,"sku":"CSR12","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/csr12.jpg?v=1779243923"},{"product_id":"cs2td","title":"Turbidity Sampling and Dewatering Compliance","description":"\u003cp id=\"isPasted\"\u003eTurbidity sampling is a critical component of stormwater compliance during construction dewatering operations. This course provides comprehensive training on how to properly collect, measure, and interpret turbidity data to meet regulatory requirements and prevent discharge violations. \u003c\/p\u003e\n\u003cp\u003eYou’ll learn how to perform turbidity sampling using industry-standard methods, understand NTU benchmarks (including common thresholds like 50 NTU), and identify when corrective actions are required. \u003c\/p\u003e\n\u003cp\u003eA key feature of this course is a scenario-based practical assignment, where learners evaluate real-world turbidity readings, assess site conditions, and determine appropriate corrective actions. \u003c\/p\u003e","brand":"StormwaterONE","offers":[{"title":"Default Title","offer_id":45694649237702,"sku":"CS2TD","price":199.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/files\/CS2TD.jpg?v=1779243999"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0667\/8606\/6630\/collections\/North_Carolina.png?v=1759242120","url":"https:\/\/stormwaterone.com\/collections\/north-carolina.oembed?page=3","provider":"StormwaterONE","version":"1.0","type":"link"}